The Network Inside an AI Factory: Optics, Cabling and Placement
Lasers, fiber crews and where a job lands now shape AI cluster networking as much as the switches do. Inside the three networks of an AI factory, and the places where each one gets stuck.
By KloudXNov 20268 min readResearch as of Nov 2026
Why would a chip company value a laser maker at $115 billion?
On Nov 2, Marvell agreed to acquire Lumentum in an all-stock deal that gives Lumentum an implied enterprise value of $115 billion. Its explanation was about physics: "the physical limitations of copper-based connectivity are accelerating the transition toward optical technologies." In plain terms, AI clusters have grown too large and too fast to wire with copper alone, and the lasers that turn electrical signals into light have become a strategic part of the supply chain.
The deal points at the part of an AI cluster that usually gets less attention than the GPUs: AI cluster networking. A cluster is only as fast as the links between its chips, and those links now come with their own shortages, their own crews and their own design choices.
Three networks, not one
An AI cluster has three distinct networks, and they fail and get delayed in different ways.
Inside the rack (scale-up). In an Nvidia NVL72 rack, 72 GPUs are linked by NVLink so tightly that they behave almost like one large processor. These links run over copper, over short distances, within the rack.
Between racks (scale-out, or the back-end network). Once a job is bigger than one rack, racks talk to each other over a separate fabric of switches, optical transceivers and fiber. This is the network that carries training traffic between thousands of GPUs, and it is built on either InfiniBand or Ethernet.
To the outside world (the front-end network). Storage, users and the internet connect through a third network, and through fiber that leaves the building.
The gap between the first two is large. SkyPilot, which builds software for running AI jobs, notes that NVLink gives each GPU 1.8 TB/s of bidirectional bandwidth inside the rack, while traffic between racks on its InfiniBand clusters runs at 400 Gb/s per direction. Converted to the same units, the link inside the rack carries roughly 18 times as much per direction (illustrative arithmetic). That difference is why placement, covered below, matters so much.
Ethernet or InfiniBand between the racks
The fabric between racks has been a long-running choice between InfiniBand, long the default for AI training, and Ethernet, usually tuned for AI with RDMA over Converged Ethernet (RoCE). RDMA, or remote direct memory access, lets one server's GPUs read and write another's memory without routing every transfer through the CPU, which is what training traffic needs.
The market data points one way overall, with a caveat. In September, Dell'Oro Group reported that switch sales for AI back-end networks passed front-end networks for the first time in the second quarter of 2026, that Ethernet "further extended its lead in AI back-end networks," and that 800 Gbps switches made up the vast majority of Ethernet shipments, with 1.6 Tbps expected to ramp in the second half of 2026. A quarter earlier, Dell'Oro Group had reported InfiniBand sales more than tripling in a single quarter, even as Ethernet held about two-thirds of switch sales in AI clusters. InfiniBand is far from gone.
Large operators show the direction all the same. Meta runs its Prometheus supercluster on a dedicated Ethernet back-end network. In an October post on its OCP Summit work, Meta also introduced what it calls its "first-generation liquid-cooled network rack," holding switch blades with 128 ports of 800G each. Switches, too, are now dense enough to need liquid cooling.
For a smaller buyer, the choice usually comes down to three practical questions rather than benchmarks. The first is what the GPU vendor or cloud provider supports and has validated with the racks being bought. The second is what the team can run: InfiniBand has a long track record in training clusters and comes as a tightly integrated stack, while Ethernet uses tools and skills that many network teams already have and is sold by more vendors. The third is what can actually be delivered on the cluster's schedule, because a fabric that arrives three months after the GPUs can easily cost more than any performance difference between the two. That last point is where the network meets the supply chain.
The supply chain is lasers and glass
Every link between racks needs optical transceivers at both ends, and at today's speeds those transceivers need high-performance lasers. Dell'Oro expects the AI network market to remain "supply-constrained, rather than demand-constrained, for at least the next one-to-two years." Marvell's deal for Lumentum is the clearest sign of how valuable laser capacity has become.
For a mid-size buyer, this has a practical consequence. The largest buyers order optics in huge volumes and well ahead of need. A 2,000 GPU cluster that leaves transceivers to be sourced late can find that the GPUs arrive before the optics do.
Fiber has its own constraints. Telecom Gazette reported in October that fiber prices "have risen as much as 50% since the start of the year," citing CoBank. And installing it takes skilled people: by some estimates, the US is 58,000 workers short of the workforce needed to install the fiber-optic cable that connects data centers to the internet, NBC News reported in August.
Inside the hall, the cabling is dense, precise work. Every scale-out link has to be routed, labeled, cleaned, installed to plan and tested. A cabling plan that changes mid-build, or a crew booked too late, delays the whole cluster.
Placement: where a job lands decides its speed
Once the cluster is built, the network shapes performance in a less obvious way: where each job runs.
Because NVLink inside a rack is so much faster than the fabric between racks, a job that fits inside one rack's NVLink domain runs very differently from one spread across several racks. SkyPilot puts it directly: "a multi-node job spread across racks is still bottlenecked by InfiniBand."
The effect is measurable. SkyPilot reports that Nvidia's GR00T team, which builds AI models for robots, running a pre-training job on 512 GB300 GPUs, found that "Rack-aware placement raised throughput by 14.4%." Nothing about the hardware changed. The scheduler simply placed related work inside the same racks.
That makes scheduling a network decision, not just a software one. A provider or in-house team running NVL72 racks needs a scheduler that knows the rack boundaries and keeps tightly linked work inside them. The same idea shapes how failed GPUs are handled, which NVL72 Lessons covers in detail.
What to settle before the racks arrive
The network has more owners than any other part of a cluster: the GPU vendor, the optics supplier, the cabling contractor, the landlord who owns the fiber routes, and whoever writes the scheduler. Problems tend to appear in the gaps between them. A few decisions remove most of those gaps:
- Who is sourcing the transceivers, and are they ordered with delivery dates that match the GPUs
- Which fabric the cluster will use, and whether the team can run it in production
- Whether the site has diverse fiber routes and carriers, and space in its meet-me room, the room where outside carriers connect to the building's network
- Who installs and tests the cabling, to which plan, and when the crew is booked
- Whether the scheduler is rack-aware from day one
The fiber deserves the last word, since every other part of the network depends on it. Nathan Leamer, a former policy adviser at the FCC, put it in a line quoted by Telecom Gazette: "A data center with power and no fiber is a very expensive warehouse."
Network plans, reviewed early
Optics, fiber and cabling belong in one plan with power and cooling. Request an assessment for a specific cluster.
Sources
Figures are as reported by each source at the time of writing. Research as of Nov 2026.
- Marvell, on combining with Lumentum (Nov 2, 2026)
- Meta Engineering, "Inside Prometheus" (Oct 19, 2026)
- SkyPilot, on scheduling for Grace Blackwell racks (Oct 29, 2026)
- Dell'Oro Group, on AI back-end network switch sales in 2Q 2026 (Sep 3, 2026)
- Dell'Oro Group, on Ethernet and the InfiniBand rebound in 1Q 2026 (Jun 2, 2026)
- Meta, OCP Summit 2026 networking (Oct 12, 2026)
- Telecom Gazette, on fiber prices (Oct 28, 2026)
- NBC News, on the data center labor shortage (Aug 6, 2026)
Image credits
More from the blog
Facility Readiness
Is Your Building Ready for 140 kW and 220 kW Racks?
Nov 2026
Buyers and Strategy
APIs, Private Models or Sovereign AI: The 2027 to 2030 Outlook
Nov 2026
Buyers and Strategy
Enterprise GPU Buyers: Who Buys and Who Decides
Nov 2026