Gross MW vs IT MW: How Much Compute Fits in a 20 MW Building

One data center can have three different megawatt numbers. Rent, rack counts and GPU counts all follow the smallest one, the critical IT load, so gross MW vs IT MW and PUE decide how much compute really fits in a 20 MW site.

By KloudXNov 20268 min readResearch as of Nov 2026

Close-up of server cooling fans in a data center

Cipher Mining's Black Pearl campus in West Texas is a 300 MW site. Amazon, its tenant, leases 216 MW of it. The other 84 MW is set aside for cooling, power conversion, losses and margin for the hottest day. None of it is sold as server power.

Anyone doing AI data center capacity planning needs to know which of those numbers they are looking at, because the critical IT load is the only one GPUs can use. Two sites can both be listed at "20 MW" while one quotes the power the whole site draws from the utility and the other quotes the power delivered to the servers. Converted to the same basis, as the example below shows, the cheaper-looking offer can hold about 40 fewer GPU racks and cost more for every unit of compute it can actually run.

Gross MW vs IT MW: one site, three megawatt numbers

When someone says a site has "20 MW," they could mean any of three things:

  1. Utility or connection capacity. The power the utility has agreed to supply to the site.
  2. Gross facility power. The power the building is designed to draw, including cooling, electrical losses, lighting and offices.
  3. Critical IT load. The power available to the IT equipment itself: GPU servers, networking and storage. This is what your cluster runs on.

Company filings show how big the gap is. The Black Pearl figures come from an investor presentation filed with the SEC, which lists the campus as "300 Gross MW / 216 MW Critical IT Load," leased to Amazon. Hut 8 reports 949 MW of contracted IT capacity across its AI data center portfolio, "supported by 1,330 MW of utility capacity." In both cases the bigger number is about 1.4 times the IT figure.

And the money follows the smallest number. Cipher's 15-year lease is written against the 216 MW of critical IT, for about $5.5 billion of contracted lease payments. Hut 8 describes its Beacon Point deals as two 352 MW IT leases with a combined 15-year base-term value of $19.6 billion. Divided out, that is roughly $1.7 million and $1.9 million per critical IT MW per year (simple division, averaged over the base term). None of that rent is charged on the megawatts that go to cooling and losses.

What PUE means, in plain numbers

The link between gross power and IT power is power usage effectiveness, or PUE. It is a simple ratio: the total energy a facility uses divided by the energy that reaches the IT equipment.

  • A PUE of 1.5 means that for every 1 kW reaching the servers, another 0.5 kW goes to cooling, power conversion and everything else.
  • A PUE of 1.2 means only 0.2 kW of overhead for every 1 kW of IT.
  • A PUE of 1.0 would mean zero overhead, which no real building achieves.

The industry average is still higher than most people expect. The Uptime Institute 2026 survey found an industry-wide annual average PUE of 1.52, or 1.36 when weighted by capacity, with new large facilities "routinely" reporting 1.3 or lower.

One subtlety matters for planning. PUE is usually an annual average. But the electrical design has to cover the worst hour of the year, the hottest afternoon at full load, plus redundancy. That is why a site's gross to IT ratio, its design ratio, is often higher than its typical PUE. A 1.4 design ratio is not the same as a 1.4 PUE.

Liquid cooling lowers PUE, but ask how it was measured

Modern AI halls are moving to liquid cooling, which moves heat far more efficiently than air. The claims are impressive. The founder of ECL said of its GB300 deployment, with racks of about 150 kW: "Our PUE over here is 1.05," in an interview with Data Center Richness.

Metered numbers are rarer, and more useful. A Madrid GPU operator, GPU Solutions, opens its own report with a dry observation: "Every datacenter vendor advertises a 1.2 PUE." It then published metered figures for its direct-to-chip liquid-cooled hall: an annualized PUE of 1.18, a low of 1.13 in January and a reported peak of 1.24 in a 41°C Madrid August. Its view on comparing sites: "The only comparable numbers are annualized with independent physical metering."

That spread, 1.13 on a cold day and 1.24 on the hottest, is exactly why the design ratio sits above the average. It also means a single PUE figure says little without the period and the weather behind it.

How many racks fit in 20 MW

Here is the practical version. The table below is illustrative arithmetic, not a site study. It assumes about 140 kW per Nvidia GB300 NVL72 rack (Vertiv rates its factory-built GB300 rack at up to 142 kW) and about 220 kW per Vera Rubin NVL72 rack, a figure from one analyst model reported by Investing.com.

If "20 MW" meansCritical IT loadGB300 racks (about 140 kW)GB300 GPUs (72 per rack)Vera Rubin racks (about 220 kW)
20 MW of critical IT20.0 MWabout 142about 10,200about 90
20 MW gross, design ratio 1.216.7 MWabout 119about 8,600about 75
20 MW gross, design ratio 1.414.3 MWabout 102about 7,300about 64

The difference between the first and last rows is about 40 GB300 racks, or roughly 2,900 GPUs, in what both offers call a "20 MW" building.

These are upper bounds. Network switches, storage and management servers also draw IT power, and a well-run cluster keeps some capacity in reserve for spares and burn-in. The real rack count will be somewhat lower. But the direction is the point: racks per megawatt only make sense once you know which megawatt you are dividing, so always convert to critical IT before counting racks.

Rack density moves the answer just as much as the ratio does. The same 14.3 MW of IT holds about 102 GB300 racks but only about 64 Vera Rubin racks. A building planned around one generation of hardware can hold more than a third fewer racks of the next, even though its megawatts haven't changed.

Compare offers per critical IT MW

Here are two "20 MW" offers side by side, with illustrative numbers:

  • Offer A: $2.0 million per MW per year on 20 MW of gross power. That is $40 million a year. If the design ratio is 1.4, the site delivers about 14.3 MW of IT, so the real price is about $2.8 million per critical IT MW.
  • Offer B: $2.4 million per critical IT MW per year on 20 MW of IT. That is $48 million a year for 20 MW of usable IT.

Offer A looked 17% cheaper per megawatt. Per unit of usable compute power, it is about 17% more expensive, and it fits about 40 fewer GB300 racks.

For context, the two filed leases above work out to roughly $1.7 million and $1.9 million in rent per critical IT MW per year. Those are hyperscale deals of hundreds of megawatts, so smaller buyers should expect to pay more, but the unit is the point: comparing in rent per critical IT MW makes offers line up.

Before you count racks

Every megawatt figure in an offer should arrive with a few facts attached. First, which megawatt it is: utility connection, gross facility power or critical IT load. Second, the design ratio for the hottest hour at full load, since that, not the annual PUE, decides how much IT the electrical system can really carry. Third, whether the PUE is metered and annualized or only a design claim; an operating site should be able to show a year of metered data.

Two more numbers finish the picture. One is the rack density the room supports, because a hall built for 40 kW racks can't host 140 kW or 220 kW racks without new power and liquid cooling. The other is the price per critical IT MW, so that every offer answers in the same unit.

If the site's power itself is uncertain, that question comes before all of these, and the six-document power verification check covers it. Once every figure is translated into critical IT load, the rack count is simple division.

Sizing a cluster for a site?

Model My Cluster works backward from a GPU count to the critical IT load and rack density a site needs to deliver.

Sources

Figures are as reported by each source at the time of writing. Research as of Nov 2026.

  • SEC, Cipher Mining's Black Pearl investor presentation (Feb 2026)
  • Hut 8, second 352 MW IT lease at Beacon Point (Jul 20, 2026)
  • Uptime Institute, on 2026 PUE survey results
  • Data Center Richness, interview with ECL's founder (Jan 2026)
  • GPU Solutions, metered liquid cooling PUE (Mar 10, 2026)
  • Vertiv, SmartIT for NVIDIA GB300 NVL72
  • Investing.com, on the cost of deploying Vera Rubin infrastructure