Blogs
Research-backed explainers on AI infrastructure: power, sites, deployment, GPU supply and the economics of capacity.
Facility Readiness
Is Your Building Ready for 140 kW and 220 kW Racks?
GB300 racks draw up to 142 kW and Vera Rubin racks about 220 kW, all of it carried away by liquid. Liquid cooling readiness means a path for that heat from the rack to the roof, the equipment to build it, and a clear answer on who pays.
Nov 2026 · 9 min read
Facility Readiness
The Network Inside an AI Factory: Optics, Cabling and Placement
Lasers, fiber crews and where a job lands now shape AI cluster networking as much as the switches do. Inside the three networks of an AI factory, and the places where each one gets stuck.
Nov 2026 · 8 min read